Preventive maintenance and productive capacity of the road team of the decentralized autonomous government, Pastaza. Ecuador

Authors

DOI:

https://doi.org/10.35381/i.p.v5i1.2682

Keywords:

Evaluation, maintenance, Risk prevention, planning, machinery, (UNESCO Thesaurus)

Abstract

The objective of this research is to evaluate the methodology applied for the preventive maintenance of the road equipment of the Autonomous Decentralized Provincial Government of Pastaza. The research was descriptive and was carried out in the Provincial GAD of Pastaza, specifically in the Administrative Directorate, Public Procurement and Mechanics and Maintenance Headquarters. The results showed that the institution is currently not taking advantage of the benefits of having a preventive maintenance plan, since an adequate temporality is not determined and therefore the work fronts are paralyzed due to machinery failures. In conclusion, not applying a maintenance plan prevents detecting minor damage and taking timely corrective actions that trigger major breakdowns, putting productivity and efficient use of the resources available to the institution at risk when venturing into road works by direct administration. , jeopardizing the continuity of the service.

Downloads

Download data is not yet available.

References

Aguilar, J. (2017). Planificación estratégica en la gestión administrativa de la secretaria de Obras Públicas - GPAO, para optimizar la operatividad del equipo caminero. [Strategic planning in the administrative management of the Secretary of Public Works - GPAO, to optimize the operation of the road team]. (Tesis de Maestría). Ecuador: Universidad Técnica de Machala. https://n9.cl/u91nv

Alarcón, J. (2020). Manual de procedimientos para la logística y mantenimiento de vehículos y maquinaria del GADMC la Joya de los Sachas. [Manual of procedures for the logistics and maintenance of vehicles and machinery of the GADMC La Joya de los Sachas . (Tesis de Maestría). Quito, Ecuador: Universidad Tecnológica de Israel. https://n9.cl/aeuda

Álvarez, S. F. (2018). Propuesta de un modelo de gestión de mantenimiento vehicular en la Empresa Eléctrica de Azogues C.A. [Proposal for a vehicle maintenance management model at Empresa Eléctrica de Azogues C.A ]. (Tesis de Maestría). https://n9.cl/2g604

Anchahuanco, A. (2020). Análisis del mantenimiento centrado en la confiabilidad –RCM, – en la subestación San José, para la estabilidad del sistema interconectado nacional SEIN. 24-25. [Reliability-focused maintenance analysis –RCM,– in the San José substation, for the stability of the SEIN national interconnected system. 24-25]. (Tesis de Maestría). https://n9.cl/vcn7p

Asca, G., Solis, M., Ramos, O., & Espinoza, R. (2020). Gestión administrativa análisis del proceso de adquisiciones. [Administrative management analysis of the procurement process]. INNOVA Research Journal, 5(3), 281-299. https://n9.cl/0vxmt

Giraldo, O., & Villalobos, D. (2014). Prospectiva metodológica para el mantenimiento preventivo. [Methodological prospective for preventive maintenance]. Ingenium, 15(30), 23-27. https://n9.cl/l5c77

Gobierno Autonomo Descentralizado Provincial de Pastaza. (2020). Plan de Ordenamiento Territorial de la Provincia de Pastaza 2025. [Land Management Plan of the Province of Pastaza 2025] Puyo. https://n9.cl/qgj03r

González, J., Martínez, E., Barreto, E., Espinosa, V., & Cabrera, J. (2020). Modelo con enfoque logístico para diagnosticar la gestión de mantenimiento de una entidad productora de envases. [Model with a logistic approach to diagnose the maintenance management of a container producing entity]. Ingeniería Mecánica, 23(2). https://n9.cl/ua7gv

Hernández, A., Medina, A., & Nogueria, D. (2009). Herramientas para la mejora de procesos hospitalarios. [Tools for the improvement of hospital processes]. Ingenieria Industrial, 30(2), 1-5. https://n9.cl/tugg9

López, W. (2021). Modelo de Gestión por procesos para optimizar el funcionamiento del area de mantenimiento del GAD Provincial de Cañar. [Process Management Model to optimize the operation of the maintenance area of the Provincial GAD of Cañar]. (Tesis de Maestría) Cuenca, Ecuador. https://n9.cl/jefdq

Orozco, W., Narvaez, G., Garcia, W., & Quinteros, A. (2017). Gestión de mantenimiento y producción más limpia en tres instituciones de salud de Medellín, Colombia. [Maintenance management and cleaner production in three health institutions in Medellín, Colombia]. Revista Ingenieria Biomedica, 11(21), 21-25. https://n9.cl/7jx5k

Salazar, D., & Romero, G. (2006). Planificación. ¿Éxito Gerencial?. [Planning. Managerial success? ].Multiciencias, 6(1). https://n9.cl/eqhc8

Salgado, Y., Martínez, A., & Santos, A. (2018). Programación óptima del mantenimiento preventivo de generadores de sistemas de potencia con presencia eólica. [Optimal programming of preventive maintenance of generators of power systems with wind presence]. Ingeniería Energética, 39(3), 157-167. https://n9.cl/55n0x

Silva, I., Rodríguez, M., Acosta, R., & Gómez, P. (2019). Diseño de plan de mantenimiento preventivo para los talleres del centro CIES Sena Regional Norte de Santander utilizando metodología AMEF. [Design of a preventive maintenance plan for the workshops of the CIES Sena Regional Norte de Santander center using AMEF methodology]. Mundo Fesc, 9(18), 36-46. https://n9.cl/jz73vv

Vargas, I., Estupiñan, S., & Diaz , A. (2017). Actualidad mundial de los sistemas de gestión del mantenimiento. [World update on maintenance management systems ]. ICIDCA. Sobre los Derivados de la Caña de Azúcar, 51(2), 10-16. https://n9.cl/7ohj4

Published

2023-05-01

How to Cite

Barrionuevo-Guerron, J. I., Romero-Fernández, A. J., & Beltrán-Ayala, E. P. (2023). Preventive maintenance and productive capacity of the road team of the decentralized autonomous government, Pastaza. Ecuador. Ingenium Et Potentia, 5(1), 720–737. https://doi.org/10.35381/i.p.v5i1.2682

Issue

Section

De Investigación

Most read articles by the same author(s)

1 2 3 4 5 6 7 8 9 10 > >>