Transparency and effectiveness in budget execution and public procurement in cantonal governments

Authors

DOI:

https://doi.org/10.35381/r.k.v5i10.716

Keywords:

Recruitment, planning, state budget, program planning, electronic catalog.

Abstract

The objective of the research was to design an improvement plan of the public procurement processes in San José de Chimbo Cantonal Decentralized Autonomous Government, to improve transparency and effectiveness in budget execution and control. The type of research was descriptive with a non-experimental design. Among the main results, the lack of interdepartmental communication and the lack of coordination between the annual operating plan, the annual contracting plan and the budget stand out, which has caused poor budget execution. Undoubtedly, research on public procurement processes is crucial in order to enhance public management and understand the impact it has on the financial and budgetary situation of government entities

Downloads

Download data is not yet available.

References

Ardanaz, M., Larios , J., & Pérez, C. (2015). Banco Interamericado de Desarrollo. El proceso presupuestario y el gasto público en Guatemala 2000-2012. [Inter-American Development Bank. The budget process and public spending in Guatemala 2000-2012]., 1-45. Recuperado de https://n9.cl/22ma

Armas , M. (2016). La ejecución presupuestaria y las adquisiciones de bienes y servicios a través del portal de compras públicas. [Budget execution and procurement of goods and services through the public procurement portal]. Recuperado de https://n9.cl/jbd6

Asamblea Nacional (2010). Código Orgánico de Planificación y Finanzas Públicas, COPFP. [Organic Code of Planning and Public Finance, OCPPF.]. Quito: Registro Oficial Suplemento 306.

Asamblea Nacional del Ecuador (2008). Ley Orgánica del Sistema Nacional de Contratación Pública. [Organic Law of the National Public Procurement System.]. Montecristi, Manabi, Ecuador: Registro Oficial Suplemento 395. Recuperado de https://n9.cl/aum2

Arriaga-Baidal, G, & Baquerizo-Villamar, G. (2014). Manual de procedimiento de contratación pública para la empresa municipal de construcción vial (Emuvial E.P), del cantón Santa Elena, provincia de Santa Elena, año 2014. [Public procurement procedure manual for (Emuvial E.P) municipal road construction company in Santa Elena canton, Santa Elena province, year 2014]. Recuperado de https://n9.cl/7epw

Bajaña, K., & Fajardo, L. (2019). La contratación pública como herramienta de desarrollo económico en el Ecuador. [Public procurement as a tool for economic development in Ecuador]. Revista Mapa, 3(16), 126-144. Recuperado de https://n9.cl/51hx

Calán-Peñafiel, T. E., & Moreira-García, G. A. (2018). Análisis de las etapas del ciclo presupuestario en la administración pública con el enfoque de resultados. [Analysis of the budget cycle stages in public administration with the focus on results]. Revista Científica UISRAEL, 5(1), 9-22. https://doi.org/10.35290/rcui.v5n1.2018.61

Cansino-Muñoz-Repiso, J.M. (2004). Una nota sobre los principios de eficiencia y eficacia en la programación y gestión presupuestaria a la luz de la nueva Ley General Presupuestaria. [A note on the principles of efficiency and effectiveness in budget programming and budgetary management in light of the new General Budget Law]. Revista Española de Control Externo, 6 (18), 221-231. Recuperado de https://n9.cl/96iwu

Contraloría General del Estado (2002). Ley Orgánica de la Contraloria General del Estado. [Organic Law of the General Comptroller of the State]. Quito: Registro Oficial Suplemento 595. Recuperado de https://n9.cl/f8pd

Córdova-Cárdenas, E., Nárvaez-Zurita, C., & Erazo-Álvarez, J. (2020). Análisis de la recaudación de patentes municipales y plan de mejora para el GAD Intercultural del Cantón Cañar [Analysis of municipal patent collection and improvement plan for the Intercultural GAD in Cañar Canton]. Dominio de las Ciencias, 6(1), 224-251.

Erazo-Álvarez, J., & Narváez-Zurita, C. (2020). Medición y gestión del capital intelectual en la industria del cuero - calzado en Ecuador. [Measurement and management of intellectual capital in the leather industry - footwear in Ecuador]. Revista Arbitrada Interdisciplinaria Koinonía, 9(5), 437-467. http://dx.doi.org/10.35381/r.k.v5i9.662

Flores- Jiménez, R., Flores- Jiménez, I., & Vásquez- Alamilla, M. (2013). La importancia del proceso de planificación y el presupuesto administrativo en las instituciones gubernamentales. [The importance of the planning process and administrative budget in government institutions]. Recuperado de https://n9.cl/lmv0

Galarza-Pomaquiza, M., Narváez-Zurita, C., & Erazo-Álvarez, J. (2019). Costeo ABC /ABM como herramienta de control en la gestión empresarial de la Organización de Pueblos de Chibuleo (ONOPUCH) [ABC / ABM costing as a control tool in business management of the Chibuleo Peoples Organization (ONOPUCH)]. Revista Arbitrada Interdisciplinaria Koinonía, 4(2), 114-146. http://dx.doi.org/10.35381/r.k.v4i2.469

Gobierno Autónomo Descentralizado Municipal de San José de Chimbo. (2018). Informe de Ejecución presupuestaria. [Budget Execution Report.]. Chimbo-Ecuador.

González, J. (2016). Régimen jurídico del nuevo sistema de contratación pública ecuatoriano en el contexto internacional. [Legal regime of the new Ecuadorian public procurement system in the international context.]. Recuperado de https://n9.cl/dfb0

Instituto Sonorense de Transparencia (2017). Manual general de contabilidad gubernamental. [General government accounting manual]. Recuperado de https://n9.cl/p8k5

Lemus, M. (2014). La devolución del impuesto al valor agregado y el presupuesto de la Universidad Técnica de Ambato. [The refund of the value added tax and the budget of Amabato Technical University.]. Recuperado de https://n9.cl/x6cg

Locacho, V. (2015). Estudio del proceso de contratación pública de bienes y servicios y su contribución al mejoramiento de la gestión administrativa. [Study of the public procurement process for goods and services and their contribution to the administrative management improvement.]. Recuperado de https://n9.cl/4o31

Mendoza, W., Loor, V., Salazar , G., & Nieto, D. (2018). La asignación presupuestaria y su incidencia en la Administración Pública. [The budget allocation and its impact on the Public Administration]. Dominio de las Ciencias, 4(3), 313-333.

Ministerio de Economía y Finanzas. (2019). Presupuesto General del Estado. [General State Budget]. Obtenido de https://n9.cl/eor1

Ministerio de Economía y Finanzas. (2019). Normativa de Contabilidad Gubernamental. [Government Accounting Regulations]. Obtenido de https://n9.cl/jk2c

Muñoz, R., Palma, A., & Zambrano, C. (2017). Plan operativo anual en los procesos de contratación pública. [Annual operating plan in public procurement processes]. Dominio de las Ciencias, 3(1), 102-120.

Ochoa-Crespo, C., Narváez- Zurita, C., Torres-Palacios, M., & Erazo-Álvarez, J. (2020). Procedimiento metodológico para evaluar el ciclo presupuestario de las universidades particulares del Ecuador [Methodological procedure to evaluate the private universities budget cycle in Ecuador]. Dominio de las Ciencias, 6(1), 34-67.

Peña, C. (2015). Análisis del impacto de las NICSP aplicadas a la Empresa Publica Municipal de Movilidad, Transito y Trasnporte - EMOV EP en el año 2012. [Analysis of the IPSAS impact applied to the municipal public company of Mobility, Transit and Transport EMOV EP - in 2012.]. Recuperado de https://n9.cl/n53j

Ponce, D. (2014). La optimización de los procesos de compras públicas a través del Sistema Nacional de Contratación en que porcentajes generan ahorros. [The optimization of public purchasing processes through the National Procurement System whose percentages generate savings.]. Recuperado de https://n9.cl/7teh

Ratti, E. (2018). Analisis del control interno de activos fijos y existencias en la Coordinación del MIPRO-Guayaquil. [Analysis of the internal control of fixed assets and stocks in the Coordination of MIPRO- Guayaquil]. Recuperado de https://n9.cl/4v92

Rivas, E. (2008). Analisis de la Ejecucion Presupuestaria y Cumplimiento de Metas Fisicas, SILAIS RAAS, 2006. [Analysis of Budgetary Execution and Compliance with Physical Goals, SILAIS RAAS, 2006]. Recuperado de https://n9.cl/8zmp

Rueda, M. (2003). El sistema de ejecuciónpresupuestaria y su aplicación en las instituciones del Gobierno Central. [The budget execution system and its application in Central Government institutions]. Obtenido de https://n9.cl/5h69

Servicio Nacional de Contración Pública (2017). Informe de la rendicion de cuentas de la contratacion publica. [Public Procurement Accountability Report.]. Recuperado de https://n9.cl/89yti

Servicio Nacional de Contratación Pública (2015). Manual de Buenas Practicas en la Contratacion Publica para el Desarrollo del Ecuador. [Manual of Good Practices in Public Procurement for Ecuador’s Development.]. Recuperado de https://n9.cl/yye9

Servicio Nacional de Contratación Pública (2020). Sercop regula y controla las contrataciones por Emergencia. . [Sercop regulates and controls emergency contracting.]. Recuperado de https://n9.cl/9gvn

Solórzano, A. (2017). Inaplicabilidad del principio de concurrencia en los procedimientos de Régimen Especial regidos por la Ley Orgánica del Sistema Nacional de Contratación Pública. [Inapplicability of the concurrence principle in the Special Regime procedures governed by the Organic Law of the National Public Procurement System.]. Recuperado de https://n9.cl/97zn

Vera-Burbano, G. (2015). Análisis al control previo aplicado a los procesos de contratación pública. [Analysis of the prior control applied to the public procurement processes]. Recuperado de https://n9.cl/sfo6

Villareal, E., Cordero, L., & Vargas, J. (2003). Informe transparencia presupuestaria Costa Rica. [Costa Rica budget transparency report]. Recuperado de https://n9.cl/o1i8

Vintimilla, E. (2014). Evaluación de la ejecución presupuestaria como herramienta que permita elaborar estrategias para el cumplimiento de la planificación anual en la corporación eléctrica del Ecuador Hidropaute Celec EP. [Evaluation of budget execution as a tool to develop strategies for compliance with annual planning in the Hidropaute Celec EP Ecuadorian electricity corporation]. Recuperado de https://n9.cl/g0r7k

Zamora-Cabrera, E., Narváez-Zurita, C., & Erazo-Álvarez, J. (2019). Incidencia del control interno en la gestión administrativa de las IES. Caso: Departamento de Pastoral, Universidad Politécnica Salesiana. [ncidence of internal control in the administrative management of HEIs. Case: Department of Pastoral, Salesian Polytechnic University]. Revista Arbitrada Interdisciplinaria Koinonía, 4(2), 321-348. http://dx.doi.org/10.35381/r.k.v4i2.477

Published

2020-05-19

How to Cite

Vaicilla-González, M. M., Narváez-Zurita, C. I., Erazo-Álvarez, J. C., & Torres-Palacios, M. M. (2020). Transparency and effectiveness in budget execution and public procurement in cantonal governments. Revista Arbitrada Interdisciplinaria Koinonía, 5(10), 774–805. https://doi.org/10.35381/r.k.v5i10.716

Issue

Section

De Investigación